calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Climbing operations continuing even in force-8 winds

29.09.2011 | Press
At Eemshaven in the Netherlands, an advanced anthracite-fired power station with a gross output of 1600 MW is being built in the space of just four years.

Press Contact

Impressions

  • At the Eemshaven power station in the Netherlands, the modular Xclimb 60 system is climbing up to a height of 64.40 m.
  • The 13.75 m tall Staxo 100 towers for shoring the cantilever slabs on the R2UET silo building are preassembled and dismantled on their sides.

This could also be of interest for you:

DokaXdek revolutionizes Slab Construction across Europe

08.04.2024 | Press

VIENNA TWENTYTWO on the rise

15.03.2024 | Press

Do you have any questions on the article? Get in touch with us!

Fields marked with * are required.
* Please fill out all required fields!
Message could not be sent – please try again a little later!