calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Budowa Autostrady A4, obiekt E-118

Poland

Between the cities of Tarnów and Rzesow a new highway is in erection. A part of this highway consists of two bridges next to each other. With 2 DOKA CFT traveller (unbalanced in use) one of these bridges is in erection.

Back

Project data

Year of completion
2011
Project duration
6 Months
Country
Poland
Address
Debica
Realization
Karmar S.A.
Structure
Bridge
Type of structure
Cantilevering

Bridge deck/superstructure

Construction method
Straight
Cross-sectional shape
Twin-cell box girder – straight webs
Overall length of bridge
120 m
Number of spans
1
Longest span
120 m
Length of concreting section
4,8 m
Number of casting sections
13