calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

A11 Belgium

Belgium

A variety of widely differing techniques were used to construct the 12-km A11 motorway link between Bruges and Westkapelle. Construction of the 1.5-km long viaduct involves movable scaffolding, and the railway tunnela are cut-and-cover. A logistical project in a class of its own.

Challenges:

• flexible formwork solution for the movable scaffold for building the viaduct
• detailed logistics planning for dealing with several construction sections involving different methods of construction (bridge, tunnel)

Solution:

Construction of the one-and-a-half kilometre viaduct on the far side of the first motorway intersection in Bruges by the movable scaffolding technique.

Zurück zur Übersicht

Project data

Year of Completition
2017
Projektdauer
3 Years
Country
Belgium

Building Data

Viadukt
1.5 km