calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Bridge restoration over Buzau River

Romania

The bridge from Vadul Pașii was built in 1949. It has a metal superstructure with a length of 344 m with 6 openings. The specificity of this project is the attachment of the Paratop sole to the metal beam and special Doka platforms, inside the metal deck. Doka integrated a stripping solution for easy releasing the formwork after pouring.

Back

Town, county:
Vadu Pasii, jud. Buzau
Project duration:
approximately 12 months
Year of completion:
2020
Constructor:
SC INTEGRAL SA
Construction type:
Bridge

Project details

Inner Paratop platforms:
6 meters (between prefabricated beams)
Outer Paratop platforms:
3.20 meters
Area of influence between the anchoring points:
1.5 meters
Max. deck section:
33 cm

System used:

ParaTop