calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

River Suir Bridge

Ireland

With its 108 m tall pylon and 400 m span, the 465 m long cable-stayed bridge across the River Suir was not only by far the most challenging contract section of a major road-building project in SE Ireland, but is also the biggest cable-stayed bridge in the whole country. Doka supplied the entire formwork solution for this technically complex project.

Back

Project data

Year of completion
2009
Project duration
18 Months
Country
Ireland
Town or city
Waterford
Realization
Dragados
Structure
Bridge
Type of structure
Piers and pylons

Pylon

Construction method
Inclined
Structure height
110 m
Height of casting sections
4 m
Number of casting sections
28
Cycle time
7 -day cycle