Doka Xpress CEU 02/2019
By 2020, the new station at Kapfenberg will be an architecturally appealing and well thought-out railway station, in which fair-faced concrete will play an important role as a design element.
The central access building to the south is designed to be a light-flooded room in elliptical shape. The counterpart to the large glass surfaces is formed by rounded walls of fair-faced concrete, which are being constructed with the help of Doka formwork using high-quality, fair-faced concrete. For this, Doka’s framed formwork will be fitted with
Project: Kapfenberg Station
Architectt: ostertag ARCHITECTS ZT GMBH
Building contractor: ÖBB-Infrastruktur AG
Building construction: Gebr. Haider & Co.
Construction period: 12/2018 to Autumn 2019
Foreman Johann Almer,
Gebr. Haider & Co.
The quality of Doka’s special formwork will win anyone over and, in addition to correct handling, helps to achieve the desired high quality of fair-faced concrete.
Exceptional architecture and the highest attention to the surface quality of the fair-faced concrete, since the viewing distances are sometimes less than 1 m.
Doka supplies pre-assembled, custom-fit formwork boxes that are lined with Dokaplex formwork panels for a high-quality, smooth concrete surface.
Doka Xpress CEU 02/2019: The 3 phases to fair-faced concrete success
Fair-faced concrete is very popular. Learn why it is important to get everyone involved in fair-faced concrete projects to the planning table right from the outset.
Doka Xpress CEU 02/2019
An extraordinary solution for a very special staircase. Read all about how a very special formwork facing was produced with the help of 3D printing systems.
Doka Xpress CEU 02/2019
Learn all about some of the many advantages of 4D simulations for formwork planning on a bridge construction site – the Arnulfsteg Bridge.