calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Understood.

What it feels like working with single-source tunnel solutions from Doka.

Formwork solutions for Tunnel construction

Special construction projects require special know-how. When it comes to tunnel projects of any kind – whether mining or cut-and-cover construction, as well as lining & stations – Doka is your reliable partner. And Doka is much more than just a partner for formwork – it is also a one-stop supplier that can design and implement a sophisticated tunnel solution, but can also provide integrated support with project management, engineering, and on-site services.

We offer a comprehensive, worry-free package, tailored to your specific tunnel construction project. Everything from one hand – our hand.

Mining Method - Tunnel

Mining Method

Tunneling by mining method entails boring or otherwise excavating an underground cavity.

More information
Cut & Cover Method - Tunnel

Cut & Cover method

In cut-and-cover tunneling the pit remains open while the tunnel is being built.

More information
Lines & stations - Tunnel

Lines & stations

Metro projects are complex because of the individual contract sections, often involving different methods of construction.

More information

Construction Project
What is being built?

 

Structural elements

In addition to the main tunnel and depending on utilisation (road, rail, water), the stringent requirements for a tunnel project demand various safety, pedestrian and vehicular access structures.

Geometry of structure

Every Tunnel construction has its own uniqueness and complexity. We will provide the best solutions for any kind of challenges e.g. transverse section, emergency shafts / galleries & lay-bys, entrances and exits, portals.

Construction method
How is it being built?

Safety in every situation

For our customers we develop project-specific safety concepts to permit unimpeded operation, safe repositioning of the formwork and safe and fast access at any height. Safe, smooth work routines speed up the workflow.

Site Organisation

Smooth and efficient construction progress depends on functioning site infrastructure. Well thought-out formwork solutions standardize and speed up repetitive jobs, reduce risk, allow for an ideal work environment and simplify the workflow.

Construction method

Modular and flexible formwork solution that meets all geological, time and traffic related requirements.



6. On-site Services

  • digital SITE
  • Pre-assembly service
  • Formwork instructor / technician
  • Formwork inspection as assembled
  • concrefy

5. Logistics

  • Delivery and return delivery just-in-time
  • Site logistics
  • Formwork return
  • Cleaning and reconditioning
  • myDoka

4. Safety with Doka

  • Safety Systems
  • Certified formwork solutions
  • Documentation
  • Training / Operation license

Portfolio
What we offer?

Portfolio - Tunnel

1. Developing the optimal formwork solution

  • Structural analysis
  • Determining general conditions
  • Feasibility study
  • BIM with Doka

2. Engineering

  • digital ENGINEERING
  • Execution, approval & pre-assembly planning
  • Cycle planning
  • Quantities commissioned
  • Static calculations

3. Construction methods and project solutions

Get in touch

The international experience of Doka gives you pooled, concentrated knowledge for a successful project. Your contact person will help you find the best individual solution, to make your project's 'bottom line' a success, too. In short: expert specialised formwork planning with lasting benefits for your tunnel construction project.

Sergio Pérez Sánchez
Sergio Pérez SánchezNorth & Latin America +43 664 88384384
Christiaan Mouton
Christiaan MoutonMiddle East, Asia & Africa+43 664 6294067