The Constanța Bypass, part of A2 Highway, is a reference project for our company. To realize this section, Doka provided formwork for foundations, abutments, piles as well as for the construction of concrete decks.
The use of the Doka Staxo 100 scaffolding system led to the rapid assembly of the formwork for the entire passage, by making the tower units on the ground and lifting them by crane and putting them in position according to the formwork execution drawings provided by Doka Romania. All types of Staxo 100 frame dimensions of the system were used, due to the inclination of the bridge and the level differences.
The Doka Top 50 system was used for all the support areas as well as for the deck in order to make the reinforcement. All over the edge of The Top 50 formwork units, were integrated other Doka elements, such as handrail clamps that ensured work at height in maximum safety.
The Staxo 100 system combined with the Top 50 system, designed especially on the dimensions and size of the bridge, was again the perfect choice for the client.