calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Artvin Şilenkar Viaduct

Artvin, Turkey

In Artvin, the transportation is being renewed and work is continuing at full speed in the new residental area where the district center will be moved. Within the scope of the project, Doka is executing the 530m long Şilenkar viaduct. 4 sets of the Customized Cantilever Forming Traveller in first use and a special fork solution in the starting moving phase on the very tight hammerhead overcome all requirements.

Back to overview

Project data

Year of completion
2022
Country
Turkey
City
Artvin
Contractors
Sümerkan inşaat

Building data

Construction method
Pre-stressed concrete bridge
Construction Type / Segmentation
Balanced Cantilever Construction
Total length
530m
max. Span length
9,5m
Section width
16,5m
Nb. of sections
118
Longitudinal inclination
0,70%
Transversal inclination
3,20%