calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

FSE 502 North of Hjulsta

Stockholm, Sweden

Traffic site Hjulsta Norra is a contract by bypass Stockholm, the 21 kilometer long route that will link the northern parts of Stockholm County with the south. It´s Sweden´s largest road and tunnel project. NCC´s assignment includes the construction of two different 370 m long tubes. To meet the requirements an adaptable solution was designed to reuse the material of the formwork traveller from the first smaller tube also in the second tube.

Back to overview

Project data

Year of site completion
2021
Country
Sweden
City
Stockholm
Contractor
NCC

Building data

Construction method
Partially monolithic
Clear width
15,7 m / 19,5 m
Clear height
8,65 m
Totel length
2 x 370 m
Step length
10 m
Steps
2 x 38
Cycle time
weekly pouring cycle