The biggest urban project currently under way in Europe is part of the Grand Paris Express project. A consortium, led by Bouygues Travaux Publics, is currently working on batch T2A of Line 15 South. For this challenging project with complex geological formations and construction of structures under very heavy water loads and operational train lines, our customers decided to speed up the cycles by using #Concremote to monitor early age compressive strength. By using Concremote cable sensors, the users were able to strip formwork in 26 hours instead of 48 hours and thus save a lot of time.
Time savings
Time savings of 22 hours per cycle thanks to real-time data.
More Safety
Hard data for compliance conforming quality and strength thresholds.
Year of completion
2023
Period of Concremote use
02|2022 - 05|2022
Country
France
Zip/Postal Code
75001
City
Paris
Customer
Horizon consortium (Bouygues Travaux Publics and Soletanche Bachy)
Type of construction
Tunnel construction
Used Concremote hardware:
2 x Cable Sensor 2.0 and 30 lost cablesConcrete mixes in use:
1Number of measurements:
18