calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Hisingsbron Bridge

Göteborg, Sweden

Hisingbron bridge is vertical-lift bridge in Gothenburg, on the western coast of Sweden. The bridge will be approximately 350m-long and will feature a central lift span, pylons with counterweights and sup port pillars. The four pylons have a height of 55 meters above the water surface. It will feature an Arpeggio-like superstructure with a central lifting span, supported by four steel owers/pylons, raised 30m above the water level.

Challenge:

  • High demands on final concrete surface
  • Formwork system that allows to be ahead with reinforcement works
  • Fast and easy re-positioning of the formwork
  • Adjustable formwork between the steel boxes
  • High Safety in all building steps

Solution:

  • Xface plywood for perfect concrete finish of cantilevers at the main bridge
  • Special Paratop system that allows wide cantilevers
  • Special lifting kits for fast, safe and easy re-positioning of the Paratop
  • Special ladder access panels for safe access to below level
Back to overview

Project data

Year of completion
2021
Project duration
2017-2021
Country
Sweden
City
Göteborg