calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Motorway Bridge SO 223

Žilina, Slovakia

With a lenght of more than 1km, the bridge on the D3 motorway near Zilina, the fourth largest city in Slovakia, will ease the traffic situation in the country's north-western region. Two separate bridges, each with a carriageway width of 11m, will carry the motorway across a reservoir on the River Vah. Various formwork solutions were used on account of the project's complexity. They were planned by the engineers at Česká Doka branch. Progress on this build was rapid, because the equipment deployed included several Cantilever formwork travellers. Formworking operations could move ahead at a rate of 40 m per week due to short site-erection times, fast repositioning and cycle times.

Back

Project data

Year of completion
2017
Project duration
24 months
Country
Slovakia
Zip/Postal Code
‎010 01
City
Žilina
Contractors
Eurovia CS a.s. závod mosty