Sustainability and the efficient use of resources are becoming a necessity for the future. Now and in the future, precast producers will have to work on reducing CO2 emissions. By optimising concrete mix designs, knowing the exact curing times and reducing cement requirements, CO2 emissions can be reduced and both time and money can be saved. Doka has therefore implemented a solution for Austrian precast producer Oberndorfer that is tailored to the customer's needs and has been in successful operation for 5 years. Thanks to Concremote, the company benefits from the earliest possible and most reliable pre-tensioning, as well as automatic, digital documentation of measurement data for quality assurance.
Up to 90 minutes earlier pre-tensioning of precast elements.
Safe pre-tensioning or lifting of the finished parts when the required strength is reached.
Automatic Concremote reports for quality assurance.
Country
Austria
City
Gunskirchen
Postcodel
4623
Period of Concremote use
03/2018 - ongoing
Customer
FRANZ OBERNDORFER GmbH & Co KG
Type of construction
Precast elements - precast plant
Used Concremote hardware:
slab sensors 2.0 (special sensors with flat measuring point)
2 pcs. calibration boxes 2.0
Concrete mixes in use:
C30/37 to C50/60 (depending on component)
Number of measurements:
Total 1,550 (as at July 24th, 2023)