calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Nadvoz Pušenci

Slovenia

The Pušenci overpass is part of a construction project for creating tram and railway crossings at different levels on the Ormož-Murska Sobota-Hodoš route. The overpass is 183 m long and 9.95 m wide. The formwork units for columns and towerframe were produced at the Doka workshop in Slovenia.

Back

Project data

Year of completion
2013
Project duration
8 Months
Country
Slovenia
Address
Pušenci, Ormož
Postcode
2270
Town or city
Ormož
Realization
SGP Pomgrad d.d.
Structure
Bridge
Type of structure
Superstructure with falsework

Pillar/column

Construction method
Monolithic
Structure height
8.00 m
Height of casting sections
4.00 m
Overall length of bridge
183 m
Number of spans
9
Longest span
25 m
Number of piers
8
Clear height
8.5 m
Length of bridge (superstructure)
183 m
Width of bridge (superstructure)
9.95 m
Height of bridge (up to top edge of superstructure)
1.20 m
Number of casting sections
16
Cycle time
4 -day cycle
Form-facing
Formwork sheet 3-SO
Form-tie pattern
Not stipulated
Type of edge
Rounded/chamfered edge

Bridge deck/superstructure

Construction method
Curved or polygonal
Overall length of bridge
183 m
Length of bridge (superstructure)
183 m
Width of bridge (superstructure)
9.95 m
Height of bridge (up to top edge of superstructure)
1.20 m
Length of concreting section
25 m
Number of casting sections
8
Cycle time
14 -day cycle
Form-facing
Formwork sheet 3-SO
Type of edge
Rounded/chamfered edge