calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

100 Flatbush

New York, USA

New York City's first all-electric building

Doka's safety and shoring solutions aid in construction of high rise building

Located on the border of Boerum hill and downtown Brooklyn, 100 Flatbrush is the first phase of a mixed-use development by Alloy Development. The tower will include approximately 30,000sf of retail space on the ground floor and 440 rentable apartments. This will be the first completely carbon neutral all-electric building in the city, no steam or gas is said to be included. This residential building includes 396 market-rate apartments and 45 affordable apartments, which are developed in partnership with the local non-profit fifth avenue committee.

Back to overview

Building Type
Multipurpose building

The Challenge
The building's geometry and the exposed concrete architectural requirement

The Solution
Doka's integrated safety solutions and efficient formwork systems enhance construction by providing easy assembly, advanced safety features, and innovative protection measures, ultimately boosting productivity and reducing fall hazards.

Further Project Data

Advancing Safety and Efficiency in High Rise constructions

Doka was selected as a shoring and safety system supplier because of its protection screen, which offers solid panels, increasing the safety of the superstructure. Moreover Doka's Xbright protections screen solution ensures full safety around the entire perimeter of structure to ensure worker safety.

With varying floor heights between 15' to 27', a combination of SuperDek slab formwork and Staxo shoring towers was used to maximize productivity and ensure seamless transitions. The full-area enclosure around the perimeter of the building enables all work to be carried out in complete safety, protected from all weather conditions. A loading platform can be integrated into the protection screen for straightforward, safe repositioning of slab formwork, tools and other materials Doka's Super Props standing tall in reshore.


Ronnie

Ronnie | Project Superintendent | RNC Industries

"We used Doka Staxo on this project. As soon as we poured the slab, we reinforced the re-shore, and you can see the quality and safety of this product."


Project data

Location
100 Flatbush Avenue
General Contractor
Lendlease

Country
USA
Concrete Contractor
RNC Industries

City
Brooklyn, New York
Architect
Alloy Design

Building data

Height
152 m | 498.69 ft.
Stories
52

Cycle time
3-day cycle

Construction time
Estimated 8 months duration for concrete superstructure