calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Muskrat Falls

Labrador, Canada

In the construction of the 824 MW Muskrat Falls hydroelectric power station in Labrador, Canada, extreme cold is a particular challenge. Temperatures as low as -40°C are not uncommon at the site. These conditions require accuracy and expertise at the highest level in terms of planning and implementation. To meet these challenges, Doka is providing the formwork solutions and is setting new standards with its innovative Concremote system.

Back

Project data

Year of completion
2017
Country
Kanada
City
Labrador
Realization
Astaldi