calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

New Ferencváros Stadium

Hungary

One of the oldest Hungarian football stadiums is reconstructed using the Doka system formwork. The project includes two main parts: stands and main building. Task: Casting the monolithically produced walls in fair-faced concrete quality inside the stadium connected to the pre-fabricated stand structures. These steps are carried out based on the sheet pattern specified by the planner. Construction required casting 3,852 m² high-quality fair-faced concrete walls for the main building and 3,531 m² for the stands. The Framax Xlife formwork system with Doka-OptiX release-agent was used for this purpose. The result: high-quality, smooth fair-faced concrete surfaces

Back

Project data

Year of completion
2013
Project duration
12 Months
Country
Hungary
Address
Üllői út 129.
Postcode
1091
Town or city
Budapest
Realization
Moratus
Structure
Sports/leisure facilities and public function halls
Type of structure
Fair-faced concrete