calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Lochweidli Tunnel

Wattwil, Canton St. Gallen, Switzerland

Engineering, on-site services and a rentable tunnel system - the overall package scores

The Lochweidli Tunnel project in the Canton of St. Gallen is 305 metres long and principally of mining-type tunnel construction (so a good 30 blocks mostly underground) and has two portals at its entrance and exit points.

For Doka’s formwork experts the conditions of this particular project have been a baptism of fire for their new, rentable Tunnel system DokaMT - a preconfigured formwork traveller, with vibrator, concrete placing boom, pipework and filler necks; including carpenter-friendly bottom slab formwork and sealing carriages. A complete formwork traveller, modularly designed according to the modular design principle and comprised mainly of rentable components.

Press release

Back to overview

Project data

Year of completion
2021
Project duration
2020-2021
Country
Switzerland
City
Wattwil, Canton St. Gallen
Contractors
ARGE Weidli (STRABAG/Heitkamp)

Building data

Construction method
Mining construction method
Construction Type / Sementation
Partially monolithic construction method
Section height
7,65m
Section width
10,42m
Section length
10m
Number of sections
33
Total length