With this construction method, the core area is formed ahead of the trailing floors. Producing walls and floors separately allows for a simpler construction workflow with focus on the individual component.
Floors and walls are produced in one step (monolithic). With ideal planning, short distances for site crew and crane ensure additional acceleration.
The high service loads that are possible on the Platform SCP save storage space on the site at ground level. For even faster cycle times, the reinforcement operations can also be carried out above the platform. The system makes it possible to suspend working platforms that reach deep down into the shafts, enabling the crew to start carrying out finishing-jobs while the concreting works are still underway.
(A) easy site logistics made possible by openings in the decking, for equipment-handling or fitted components such as stairways
(B) safe access routes by using stair towers both on and inside the platform
(C) short distances for crew to cover thanks to nearby storage areas with high live load rating for rebar and site installations
(D) construction workflow is optimised by integrating concrete placing booms
Together with the working platform, timber-beam or framed formworks are raised to the next casting section in a single lift, by powerful hydraulic cylinders.
Working just like on the ground thanks to closed platform levels and generous stripping paths.