In Mumbai, Hindustan Construction Co. Ltd. erected an 8-lane coastline motorway bridge. The centrepieces of this structure are its two 128 m high pylons, each consisting of four legs. Owing to the complex fair-faced concrete requirements, Large-area formwork Top 50 was used here in conjunction with a steel formwork.