calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

Freight train bypass St. Pölten

Austria

Doka delivered several tunnel forming wagons for implementing building lot GUW 3 which is part of the St. Pölten freight train bypass. The goal was to merge the two tubes of the Bründlkapellentunnel into one single-tube tunnel. Since some of these twin-tube sections are separated only by a shared centre wall, the forming wagons were continuously expanded and reconfigured so that in the end it was possible to build 16 additional single-tube sections. The same formwork is then used to build the Radleitentunnel which also consists of a single tube accommodating two tracks.

Back

Project data

Year of completion
2015
Project duration
18 Months
Country
Austria
Town or city
St. Pölten
Contractors
Strabag AG
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Bründlkapellentunnel

Construction method
Partially monolithic
Cross-sectional shape
Rectangular
Clear width
5.82 m
Clear height
7.00 m
Formed length of tunnel
822 m
Length of concreting section
24 m
Number of casting sections
57

Radleitentunnel

Construction method
Partially monolithic
Cross-sectional shape
Rectangular
Clear width
11.20 m
Clear height
6.90 m
Formed length of tunnel
390 m
Length of concreting section
24 m
Number of casting sections
17 (tracks 7+9)