calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK
I consent to the use of cookies by this website for analyses and personalised content. Find out more OK

Auenbach valley crossing

Austria

As part of the twin-carriageway upgrade to Austria's A2 Süd-Autobahn a second, 700m long bridge superstructure had to be constructed alongside the existing valley crossing P30 at a height of around 70m. It was built as a steel-composite superstructure, meaning that once the steel superstructure was in place, the CIP concrete deck slab was cast with the aid of a Doka composite forming carriage.

Back

Project data

Year of completion
2006
Project duration
9 Months
Country
Austria
Address
A2 'Süd-Autobahn', Carinthia, north-west of Wolfsberg
Contractors
Steiner-Bau GmbH, St. Paul-im-Lavanttal
Structure
Bridge
Type of structure
Composite construction

Bridge deck/superstructure

Length of bridge (superstructure)
687 m
Width of bridge (superstructure)
15.30 m
Height of bridge (up to top edge of superstructure)
70 m
Cross-sectional shape of structural steelwork
I-section girder
Length of concreting section
25 m
Number of casting sections
28
Cycle time
7 -day cycle