calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Bandra-Worli Sea Link

India

In Mumbai, Hindustan Construction Co. Ltd. erected an 8-lane coastline motorway bridge. The centrepieces of this structure are its two 128 m high pylons, each consisting of four legs. Owing to the complex fair-faced concrete requirements, Large-area formwork Top 50 was used here in conjunction with a steel formwork.

Back

Project data

Year of completion
2009
Project duration
24 Months
Country
India
Address
Mumbai, Maharashtra
Realization
Hindustan Construction Co. Ltd.
Structure
Bridge
Type of structure
Piers and pylons

Pylon

Construction method
Fair-faced concrete
Structure height
128 m
Height of casting sections
3 m
Number of casting sections
43
Cycle time
3-5 -day cycle