calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Radfeld Tunnel

Austria

As part of the upgrading of the rail corridor between Munich and Verona, Strabag was tasked with building the tunnel in contract section H2-2, "Radfeld Mitte". To form and pour the cross-section of this cut-and-cover tunnel, Doka supplied 2 all-hydraulic tunnel formwork travellers.

Back

Project data

Year of completion
2010
Project duration
30 Months
Country
Austria
Address
Radfeld, Tyrol, Austria
Realization
Strabag AG
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Wall

Construction method
Partially monolithic
Cross-sectional shape
Curved/round
Clear width
11.40 m
Clear height
8.60 m
Formed length of tunnel
1600 m
Length of concreting section
10 m
Number of casting sections
160
Cycle time
7 -day cycle