calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Lochkovské údolí valley crossing

Czech Republic

Work on the 4-lane orbital motorway around Prague was one of the biggest construction projects in the Czech Republic at the time. South-west of Prague, the route traverses the valley of Lochkovské údolí at a height of 65 m. To cross this valley, a bridge was built using the incremental launching method. Doka supplied the formwork solution for the steeply inclined piers.

Back

Project data

Year of completion
2009
Project duration
12 Months
Country
Czech Republic
Address
Lochkov, nr. Prague
Realization
Max Bögl GmbH & Co. KG (MAX BÖGL a JOSEF KRYSL)
Structure
Bridge
Type of structure
Piers and pylons

Pillar/column

Construction method
Inclined
Structure height
53 m
Height of casting sections
2.10 m
Number of piers
2
Number of casting sections
25
Cycle time
5 -day cycle