calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Meldahl Hydroelectric Project

United States of America

Featuring approximately 40,000 square feet of Doka’s pre-assembled Top 50 gang formwork, the Meldahl Project is designed to provide a new source of clean, zero emission electric generation for the national grid.

Back

Project data

Year of completion
2014
Project duration
6 Months
Country
United States of America
Address
Ohio River near Foster, Kentucky
Realization
Alberici / Baker JV
Structure
Hydroelectric power station
Type of structure
Arched construction

Powerhouse

Construction method
Monolithic
Structure height
16.46 m
Height of casting sections
3,59 m
Number of spans
1
Formed length of tunnel
31.09 m
Shape
S-curve
Type of carriage/traveller or formwork
Special composite bridge-deck formwork
Form-tie pattern
Non-tied
Type of edge
Rounded/chamfered edge