calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

Las Vegas Control Tower

12.20.2012 | News
The McCarran International Airport is the primary commercial airport serving Las Vegas and Clark County, Nevada.

Press Contact

Impressions

In 2010, the airport recorded an estimated 39 million passengers passing through the terminal. With the growing need for expansion, the McCarran Airport Authority devised a plan for a new air traffic control tower to accommodate a terminal radar approach control (TRACON).

Rising for Efficiency

Doka’s formwork solutions were chosen for the construction of the air traffic control tower because of their ability to provide efficiency and safety. Having previously used the Super Climber on an 800,000-sq. ft. condo project in Chicago, Ill., the contractor felt the Super Climber would be a good fit, in combination with Doka’s SKE 50 Plus.

Doka’s Super Climber system, in use on the interior walls, is supporting high live loads on the main work deck. By raising the entire working deck and formwork from floor to floor with a push of a button, the Super Climber allows fast and safe construction. A hanging stair tower is also integrated into the Super Climber. This five-story stair tower was built with Doka’s Staxo 100 to allow the carpenter safe access to the top of the forms and climbing system.

Introducing SKE 50 plus

Climbing the outside walls, Doka’s SKE 50 Plus provided a versatile solution. The SKE 50 Plus is a new system and is being used for the first time in the U.S. on the McCarran Airport project. With features including automatic brakes and a spring loaded suspension wedge to eliminate manual placements on the climbing shoe, faster completion time and maximum safety are possible in all phases of the project.

The exterior walls feature an architectural finish that varies at random plank depths, uses fair-faced formliner concrete, and will change colors three times. The special pattern formliners were supplied by Doka and attached to the Top 50 formwork. Pour heights reached about 19 ft. high with the system.

For each lift on this project, more than 12,000 sq. ft. of formwork is in use. Changing conditions will require the SKE 50 plus to be removed at level 14 because of a slab projection, but the interior core will remain intact. With 23 lifts on the project, there is an overall height of 354 ft. In addition, the unique design of the flared wing walls, on all four sides, not only made this a challenging formwork job, but it will help make the air traffic control tower at McCarran one of the most modern looking towers in the country.

This could also be of interest for you:

Doka commits to Science Based Targets initiative (SBTi)

03.12.2024 | Press

Doka’s Preassembly Services Bring Efficiency and Precision to Wagner Pavilion in New York

11/11/2024 | Press

Do you have any questions on the article? Get in touch with us!

Fields marked with * are required.
* Please fill out all required fields!
    Message could not be sent – please try again a little later!