calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

New Ferencváros Stadium

Hungary

One of the oldest Hungarian football stadiums is reconstructed using the Doka system formwork. The project includes two main parts: stands and main building. Task: Casting the monolithically produced walls in fair-faced concrete quality inside the stadium connected to the pre-fabricated stand structures. These steps are carried out based on the sheet pattern specified by the planner. Construction required casting 3,852 m² high-quality fair-faced concrete walls for the main building and 3,531 m² for the stands. The Framax Xlife formwork system with Doka-OptiX release-agent was used for this purpose. The result: high-quality, smooth fair-faced concrete surfaces

Back

Project data

Year of completion
2013
Project duration
12 Months
Country
Hungary
Address
Üllői út 129.
Zip/Postal Code
1091
City, State
Budapest
Realization
Moratus
Structure
Sports/leisure facilities and public function halls
Type of structure
Fair-faced concrete