calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

Minera Escondida

Chile

Copper mining Project at 3,200 m above sea level

The OGP1 replaces the concentration plant Los Colorados to increase the production of copper to 152,000 tons per day, enabling the process of minerals with higher content of copper, found under the existing production facilities.

Challenge
Enable short-term changes during construction phase on a remote site.

Solution

  • Engineering on site for fast and flexible adaption of execution drawings during construction phase
  • One-stop-shop supplier with one formwork contact and less administrative effort to control and coordinate