With its 108 m tall pylon and 400 m span, the 465 m long cable-stayed bridge across the River Suir was not only by far the most challenging contract section of a major road-building project in SE Ireland, but is also the biggest cable-stayed bridge in the whole country. Doka supplied the entire formwork solution for this technically complex project.