calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

U4 "HafenCity", high supporting construction frames

Germany

This extension of the U4 line begins at the existing Jungfernsteig station, from where it runs underground in a southerly direction. Two new stations were built in the HafenCity: 'Überseequartier' and 'HafenCity Universität'. In the works on the Überseequartier station building, horizontally arranged trench-shoring girders made it impossible to lift and reposition the wall formwork elements by crane. This necessitated using a traveller unit from which the wall formwork was suspended in large-area gangs. The excavation pit for the 'HafenCity Universität' contract section was so narrow that there was only enough space for single-sided formwork to form the 1.50 m thick and 10.60 m high walls. Doka supporting construction frames, coupled with Attachable frames F 2.40, were the right formwork concept here.

Back

Project data

Year of completion
2009
Project duration
12 Months
Country
Germany
City, State
Hamburg
Realization
Arge U4-HafenCity
Structure
Tunnel
Type of structure
Cut-and-cover tunnel

Stop Überseequartier

Cross-sectional shape
Rectangular
Clear width
17,68 m
Clear height
10,20 m
Formed length of tunnel
168 m
Length of concreting section
10,16 - 11,65 m
Number of casting sections
30

Stop HafenCity University

Cross-sectional shape
Rectangular
Clear width
16,48 m
Clear height
10,60 m
Formed length of tunnel
135 m
Length of concreting section
10,20 m
Number of casting sections
13