calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

Wiesing Tunnel H3-6 / Jenbach Ost

Austria

Contract section H3-6 (Wiesing / Jenbach Ost, known as the "Tiergarten tunnel") was for an approx. 671 m long section of tunnel forming part of the Munich-Verona rail transit corridor in Tyrol's Lower Inn Valley. This tunnel links the two contract sections H8 and H3-4. To improve site access and for subsequent use as an escape route, an approx. 160 m long drive-through access tunnel was built here.

Back

Project data

Year of completion
2008
Project duration
3 Months
Country
Austria
City, State
Jenbach
Realization
Beton-und Monierbau - Alpine - Jäger
Structure
Tunnel
Type of structure
Mining-type tunnel

Wall

Construction method
Partially monolithic
Cross-sectional shape
Curved/round
Clear width
8.22 m
Clear height
5.35 m
Formed length of tunnel
202 m
Length of concreting section
10 m
Number of casting sections
25