calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

Hochbrücke Freimann motorway overpass

Germany

On the northern outskirts of Munich, the 586 m long Hochbrücke Freimann overpass was built to carry the 9-lane A9 Nuremberg-Munich motorway across two multi-lane ring-roads and several railway lines. Severe damage from de-icing salt necessitated the partial demolition and rebuilding of the overpass, yet while maintaining traffic flow.

Back

Project data

Year of completion
2010
Project duration
20 Months
Country
Germany
Address
A9 autobahn – Frankfurter Ring
City, State
Munich
Realization
Dywidag, Nuremberg Branch
Structure
Bridge
Type of structure
Composite construction

Cantilevered parapet

Construction method
Curved/round
Length of bridge (superstructure)
586 m
Parapet height
0.70 m
Parapet width
0.85 m
Height of inner shield
0.17 m
Length of concreting section
23 m
Number of casting sections
45