calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

Jablunkov bypass

Czech Republic

Reinforced-concrete composite construction with top-placed bridge-deck slab. The bridge starts with a straight section before transitioning into a long curve. The structural steel takes the form of an open trough with diagonal struts in the cantilever-arm zone. Due to these diagonal struts, an underslung composite forming carriage was used.

Back

Project data

Year of completion
2008
Project duration
6 Months
Country
Czech Republic
Address
739 98 Mosty u Jablunkova
Realization
Alpine Bau, Vienna
Structure
Bridge
Type of structure
Composite construction

Bridge deck/superstructure

Shape
Radius
Type of carriage/traveller or formwork
Underslung composite forming carriage
Length of bridge (superstructure)
432 m
Width of bridge (superstructure)
18.80 m
Height of bridge (up to top edge of superstructure)
21 m
Cross-sectional shape of structural steelwork
Trough with bracing
Clear width of structural steelwork
5.90
Clear height of structural steelwork
2.10
Length of concreting section
33 m
Number of casting sections
15
Cycle time
7 -day cycle