calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

Wienerwald Tunnel

Austria

With its geometrically challenging intersections, the emergency ventilation cavern is one of the most difficult casting sections, from the formwork-technology point of view, of the entire 13 km long Wienerwald Tunnel. It constitutes the transition zone between the bored section of tunnel and the section created by mechanical heading work.

Back

Project data

Year of completion
2011
Project duration
4 Months
Country
Austria
City, State
Vienna
Realization
JV "ARGE Wienerwald Tunnel"
Structure
Tunnel
Type of structure
Mining-type tunnel

Underground chamber

Construction method
Segmented (non-monolithic)
Cross-sectional shape
Curved/round
Clear width
13.95 m
Clear height
10 m
Formed length of tunnel
35 m
Length of concreting section
15 m
Number of casting sections
3

Underground chamber

Construction method
Segmented (non-monolithic)
Clear height
6 m
Formed length of tunnel
35 m