calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
Visit the International Website

Central Hidroelectrica Angostura, Chile

Chile

This project consists of a discharge tunnel for the largest hydroelectric power station built over the course of the last decade in Chile. Due to the size of the cross-section, Doka planned a 2-storey forming carriage made of the Doka load-bearing tower SL-1. In spite of the great longitudinal inclination of 13.75%, it was assembled with this inclination by a Doka formwork instructor.

Back

Project data

Year of completion
2013
Project duration
6 Months
Country
Chile
Address
Los Angeles Chile
City, State
Los Angeles
Realization
Empresa Constructora Angostura Ltda
Structure
Tunnel
Type of structure
Mining-type tunnel

Wall

Construction method
Partially monolithic
Cross-sectional shape
Curved/round
Clear width
10.75 m
Clear height
10.75 m
Formed length of tunnel
168 m
Length of concreting section
10 m
Number of casting sections
18