calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

Corridor Vc, bridges at Studenčica and Trebižat

Bosnia/Herzegovina

Doka Cantilever forming travellers (CFT) allow for pouring 5-m segments in a weekly cycle. Hence they significantly impact the overall number of steps required for construction of challenging spans. As a result, eight fewer casting sections were required.

Back

Project data

Year of completion
2014
Project duration
14 Months
Country
Bosnia/Herzegovina
Address
Studenci near Ljubuško
Realization
"Hering d.d. Široki Brijeg (subcontractor of Czech Consortium OHL ŽS a.s.)"
Structure
Bridge
Type of structure
Cantilevering

Bridge deck/superstructure

Construction method
Straight
Structure height
85 m
Number of spans
6
Longest span
120 m
Number of piers
5
Length of bridge (superstructure)
559 m
Width of bridge (superstructure)
12.54 m
Height of bridge (up to top edge of superstructure)
6.10 m
Length of concreting section
5.00 m
Cycle time
6 -day cycle