calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK
I consent to the use of cookies by this website for analyses and personalized content. Find out more OK

MO-47 Bridge

Washington, MO

The Route 47 Missouri River Bridge is a vital link for both Franklin and Warren Counties with about 11,000 vehicles a day using it. The Missouri DOT is building a new bridge to replace the old deteriorating bridge. The approximately $43 million, 2,560-ft bridge, located west of the existing bridge, will have two 12-ft lanes with 10-foot shoulders. It will also have a 10-ft bike/pedestrian path that will connect to the KATYTrail in Warren County.

Challenge:

  • Architectural concrete finish
  • Not permitted to use standard gang formwork
  • Limited amount of time in schedule to build custom boxouts

Solutions:

  • Custom Steel Girder Formwork prebuilt and delivered to the site ready for use
  • Custom Girder that provided the desired architectural concrete finish
  • A combination of standard and custom Steel Girder forms that were prebuilt and delivered to the site ready for use

Back

The Facts

Project name:
MO-47 bridge
Location:
Washington, MO
Contractor:
Alberici Constructors, Inc.
Doka equipment used:
Custon Steel Girder Formwork

Systems used

Steel Girder Formwork