Doka tunnel formwork travellers for motorway between Ljubljana and the Adriatic Sea. The twin-tube Dekani Tunnel was driven using underground construction methods. The tunnel contains four emergency lay-bys and five cross-tunnels – the largest two of which have flared trumpet-shaped ends.