Challenge:
Detailed Design of Formwork and Shoring including indication of Cordinates for position of support legs and level of each U head Jack in 3D, Supply of all Formwork and Shoring for 8 Box type Viaducts and Precast Beam Support for 3 Junctions, Underpass structure with Passage to be able to shift on rollers as well as all Formwork Instructor involvement in actual training of site staff.
Solution:
SL-1 Superstructure with passage with hydraulic jacks for lowering into rollers. Design of special Adjustable Connecting Plate moving in 2 Directions to suit constant geometry changes.