One of the key components in the Linthal 2015 pumped-storage power plant project is the enlargement of the Lake Mutt reservoir, sited high in the Swiss Alps at an altitude of some 2500 metres above sea level. A dam 1025 metres long is now being built and when completed, it will be the longest of its kind in Switzerland.