The project at the Ledvice power-station complex was to build a new cooling tower with a 98 m diameter at the bottom of the shell, tapering to approx. 68 m by the waist of the tower. 100 climbing units of the Doka cooling-tower formwork system SK175 were in action during the construction operations, reaching the final shell height of 136 m in 93 casting steps.