Nissibi Bridge
Turkey
The Nissibi Bridge crosses over the Atatürk Reservoir at the Euphrates River and was built to reduce travel times in this south-eastern region of Turkey. Doka supplies the custom-tailored formwork concept for the demanding shapes of the pylons.
construction of two pylons, each 96 m tall and inclined by 13.7 °
taking into account high wind speeds (limited opportunities for crane use)
adherence to tight construction schedule
Solution
the two pylons each 96 m tall were formed without a crane using the Automatic climbing formwork SKE50 plus
thanks to this formwork solution, even wind speeds up to 72 km/h did not interrupt the climbing progress
the two pylon legs inclined by 13.7 ° were cast in a 7-day cycle using the Automatic climbing formwork SKE50 plus in combination with the Large-area formwork Top 50
the merging point of the legs is at 55.97 m then another 33.76 m was added to the height
the professional training from the Doka Formwork instructor on site ensured proper assembly and handling of the formwork systems
Thank you for your interest - Nissibi Brücke.
Please, fill in the form below to receive more information on this topic and access it conveniently from your email later.
All listed fields are required.
By using our site, necessary cookies are set on your device for the execution of the service. Find out more in our data privacy policy
https://www.doka.com/data-privacy.
Thank you very much for your interest - Nissibi Brücke.
A link with further information has been sent to the provided e-mail address.
You can now switch back to the QR code reader to request information on other topics. You have the option to save your contact details to be automatically used for your next request.