As part of the upgrading of the rail corridor between Munich and Verona, Strabag was tasked with building the tunnel in contract section H2-2, "Radfeld Mitte". To form and pour the cross-section of this cut-and-cover tunnel, Doka supplied 2 all-hydraulic tunnel formwork travellers.