On the INDX condominium project in Toronto, Doka in partnership with Hardwall Construction developed a new hydraulic protection screen system to climb 7 platforms for the next casting step at once in one hour with no crane. The system incorporates a 16 ft loading platform to
provide storage and laydown space outside the building perimeter at great heights.