Stations and lines
Mining method
Cut-and-cover method
Doka is your full-service partner on complex tunnel projects – from planning through project management to solutions that work, complete with fully integrated concrete placing and external vibrators – everything from a single source.
The steel panels adapt easily to the structure's radius during assembly and are re-usable on widely differing projects.
Project highlights
Both the hydraulics and the electric driving units have pushbutton control.