The Framax Xlife plus form tie can be operated from one side. It is the centrepiece of the Framax Xlife plus framed formwork system. It makes your job of erecting and stripping formwork for walls fast, cost-effective and safe. Due to its conical shape, there is no need for jacket tubes and cones. Innovative: Form-tie sleeves are completely sealed without wearing parts.
With effortless, damage-free tightening and releasing of the form ties using a ratchet or impact wrench
as panels are stacked even faster as there is no need to remove integrated form-tie nuts
thanks to steel-on-steel seal for form ties in the form-tie sleeves
of wall thickness in 0.5 cm or 1 cm grid by grooves, not threads; the stop cylinder has a yellow end for a fast sight-check of 1 cm grid setting
thanks to an integrated parked tie position
The system logic of Framax Xlife plus optimises material utilisation and logistics for a better overview on site. The basic panel is square and standard panels top-fix or bottom-fix set longside horizontally or vertically; there are only a few standard-panel formats - no need for small panels of many different sizes to make up gangforms.
Framax Xlife plus can be combined with the proven Framax Xlife framed formwork panels.
Both formwork systems use the same accessories (connectors, universal walings, plumbing accessories, platforms).
by utilising the form-tie points
The Framax Xlife plus wall formwork system is now extended with the introduction of a new 3.00 m high panel option. Economical forming is enabled with only two tying levels for a 3.00 m formwork height. The integrated function profiles provide additional flexibility in applications and for mounted parts such as brackets, panel struts and walings.
Alexander Dörrmann |
Managing Director, Dörrmann Bau GmbH
“For many jobs, particularly in residential construction, 3.30 m panels are too tall but 2.70 m isn’t high enough. And vertical stacking costs time and money. The 3.00 m Framax Xlife plus panels are literally just what we needed.”