The high-load timber-beam formwork with a system grid
Up to a pour-height of 3.60 m, only two 20.0 form-ties are needed, thanks to
Lowers commissioning quantities and forming-times because
Superb concrete surface, with no screw imprints in the concrete, as
Doka 3-SO three-ply sheets provide the basis for many Doka formwork systems and have a wide range of…
Reliably casting concrete surfaces in the desired fair-faced concrete category is quite a challenge,…
The pre-assembled, fold-out working platforms, with their integrable front/rear and side railings, l…