Construction professionals presented latest formwork safety methods
Press Contact
Impressions
In the context of World Day for Safety and Health at Work last week, Dubai Municipality teamed up with Doka Gulf FZE to present new safety innovations in formwork systems which comprehensively address all aspects of material quality and construction jobsite safety. The event, held at City Hall Dubai Municipality on May 1, 2012, was entitled “360 Degree Formwork Safety Symposium”. Presenters were Gerald Hoermann, Regional Technical Manager, Doka Middle East and Alexander Macho, Technical Manager, Doka Gulf FZE.
Essa Al Maidour, Assistant Director General for Engineering and Planning Sector at Dubai Municipality, Mohammed Noor Mashroom, Director of General Projects and number of senior officials as well as representatives of contracting and consulting companies have attended the symposium.
Essa Al Maidour said, the municipality is keen to cooperate with the entities working in the field of construction safety, as its Accreditation Department has approved and authorized around 35 entities to ensure the safety of construction sites throughout the emirate of Dubai. He commended the joint safety symposium initiative with Doka as a leading example of corporate social responsibility to vigilance in all aspects, including formwork safety, on sites.
Doka, the leading Austrian firm, who develops, manufactures and distributes formwork technology for use in all areas of cast-in-place concrete construction, presented topics extremely relevant to today’s construction sites in Dubai. Civic body officials, contractors and consultants listened attentively as Doka introduced the methods for successful deployment of load-bearing systems, wall and floor-slab formwork, and the Doka systems which comprehensively address the highest European safety and quality standards. Doka further encouraged contractors to engage with a reliable full-line partner who can offer formwork service expertise such as site-supervision and training throughout the entire project cycle.
The most interesting part of the program was the discussion on building safely at heights, especially when wind and visibility are a regular factor in the Middle East. A short case study on the successful completion of Dubai’s Burj Khalifa, the tallest building in the world, completed on time and with zero accidents using Doka systems as an industry leading example.
The successful event drew over 100 delegates and was conducted as a part of Dubai Municipality’s continuous and ongoing educational initiatives.
Criteria for calculating the product carbon footprint established
24.05.2024
|
Press
Doka, one of the world's leading suppliers of formwork and scaffolding, is once again demonstrating that it is a pioneer in sustainability by playing a key role in the development of minimum standards for calculating Product Carbon Footprints (PCFs) – a milestone for the formwork and scaffolding industry and a further step down the road to decarbonising the construction sector.
Doka delivers complex formwork solutions for Azizi Beach Oasis in Dubai Studio City
13.05.2024
|
Press
With its raised, beach-themed swimming area and tight deadline, Doka’s in-depth knowledge of dynamic loads and time-saving techniques is helping to deliver the latest mixed-used community project of its trusted partner, Azizi Developments.
Do you have any questions on the article? Get in touch with us!
Thank you for your interest - DM and Doka Host Formwork Safety Symposium.
Please, fill in the form below to receive more information on this topic and access it conveniently from your email later.
All listed fields are required.
By using our site, necessary cookies are set on your device for the execution of the service. Find out more in our data privacy policy
https://www.doka.com/data-privacy.
Thank you very much for your interest - DM and Doka Host Formwork Safety Symposium.
A link with further information has been sent to the provided e-mail address.
You can now switch back to the QR code reader to request information on other topics. You have the option to save your contact details to be automatically used for your next request.
Settings for cookies and third-party applications
Cookies and third-party applications are used on our website. This helps us to guarantee the best possible performance of our website, especially
the constant improvement of the functionality of our website (analysis of the user visit),
a smooth shopping experience when using the Doka online shop or
the placement of suitable advertising for users on certain platforms.
Do you consent to the use of cookies and the processing of personal data associated therewith?